Some things are easier to learn out loud.

Book a demo

A voice tutor for the conversations that matter

Praedyth is a voice-led cognitive companion. Learners talk through real workplace scenarios out loud, and Praedyth listens, responds and coaches them in a voice of its own.

Every answer becomes evidence of what they can actually do, so they move on when they're ready, not when the slides run out.

How a session works

One real lesson, Feedback in Leadership, from the first word to mastery.

Praedyth voice session: the case file beside the tutor's voice line and live captions
Praedyth playing the stand-up scenario clip beside the conversation
Praedyth tutor confirming the learner's answer as the lesson progress bar advances
  1. Talk it through

    Learners ask, answer and think aloud. Praedyth listens, replies in a voice of its own, and keeps live captions on screen. Getting it wrong is part of the practice: try again until it lands.

    • Voice conversation
    • Live captions
  2. Immersed in the scenario

    When the moment matters, the tutor plays it right beside the conversation. Learners watch the team's stand-up the morning after the outage, then talk through the pressure Noura is under.

    • Scenario video
    • Guided discussion
  3. Move on when you're ready

    Behind the conversation, every answer is evidence. Praedyth tracks what each learner has mastered, and only moves them to the next topic once they've shown it.

    • Evidence of mastery
    • Adaptive pacing

Praedyth Analytics, the whole class at a glance

Instructors and authors see how every learner is progressing, and exactly what they said to show it.

Praedyth cohort report showing progress through each topic
Praedyth learner report showing every answer by topic and session
A Praedyth progress report as a PDF, cover and results page
  1. Every cohort at a glance

    See how far each cohort got with every topic: who has mastered it, who moved on with gaps, who is still in progress, and how long it typically takes.

    • Cohort progress
    • Time to mastery
  2. Go in-depth with any learner

    Follow one person's answers topic by topic and session by session, and see exactly where the tutor had to bring them back.

    • Per-learner view
    • Answer history
  3. Reports you can hand to leadership

    Export cohort and individual progress reports as PDFs, ready to share with managers and leadership.

    • Exportable PDF
    • Proof of competence

Built for organisations

  • Your people, your cohorts

    Instructors invite learners, enrol them in lessons and follow their progress by cohort.

  • Privacy first

    Designed with learner privacy first, so people can practise openly and get things wrong safely.

  • Accessible in every session

    Keyboard-operable controls and readable, speaker-labelled live captions throughout.

See Praedyth in action

Want to hear how Praedyth can help your people practise the conversations that matter? Book a demo and we'll walk you through a live session.

Book a demo